FAT & SAT Survey Project

Independent Factory Acceptance Test (FAT) and Site Acceptance Test (SAT) Survey and technical witnessing services for marine, offshore and industrial equipment, supporting verification, installation, testing, findings and reporting before delivery, commissioning or operational handover.

FAT & SAT Survey Project Overview

Factory Acceptance Testing (FAT) is normally performed at the manufacturer, supplier or designated test facility before equipment is delivered or installed. Site Acceptance Testing (SAT) is normally performed after installation at the vessel, shipyard, offshore facility, terminal, plant or other designated project location to verify applicable functionality, interfaces, integration and site-specific requirements.

PAMS provides independent FAT and SAT survey and technical witnessing services for shipowners, operators, managers, purchasers, shipyards, offshore projects and other clients requiring independent observation and documentation of agreed testing activities.

Independent technical role: PAMS independently witnesses, observes and reports agreed FAT and SAT activities. The manufacturer, supplier, contractor or designated commissioning/testing organization remains responsible for executing the tests, while contractual acceptance, equipment release, commissioning authorization or final project approval remains with the client, owner, purchaser or designated authority.

Client Requirement

Clients may require an independent technical representative to attend FAT activities at the manufacturer or designated test facility and SAT activities at the vessel, site, offshore facility, terminal or project location.

Independent Attendance

Independent attendance provides an objective technical presence during agreed FAT and SAT activities, with observations recorded against the applicable project scope and available documentation.

Project Verification

FAT and SAT witnessing supports project verification by documenting witnessed tests, available results, technical observations, deviations and incomplete activities.

FAT & SAT Survey Project Scope

Pre-FAT / Pre-SAT Review

Review of available technical specifications, drawings, procedures, test protocols, equipment documentation and project requirements before FAT and/or SAT attendance.

FAT Witnessing

Independent attendance during agreed Factory Acceptance Test activities at the manufacturer, supplier or designated test facility, with recording of witnessed testing and available results.

SAT Witnessing

Independent attendance during agreed Site Acceptance Test activities following installation, including functional testing, system interfaces, integration checks and applicable commissioning-related verification.

Technical Observations

Recording of observed deficiencies, deviations, incomplete activities, test limitations or other technical matters identified during FAT and SAT activities.

FAT & SAT Reporting

Preparation of an independent survey report documenting attendance, equipment identification, witnessed activities, available test results, observations and recorded findings.

Follow-Up Verification

Where requested, independent attendance during re-testing, corrective-action verification or repeat FAT/SAT activities following resolution of recorded findings.

Independent FAT & SAT Technical Witnessing

PAMS acts as an independent technical observer during agreed FAT and SAT activities. FAT witnessing generally takes place before delivery at a manufacturer, supplier or designated testing facility, while SAT witnessing generally takes place after installation at the intended vessel, site, offshore facility, terminal or project location.

The applicable testing organization, manufacturer, supplier, contractor or commissioning team remains responsible for performing the tests in accordance with the approved procedures and project requirements. PAMS records what is independently witnessed and reports relevant technical observations and findings.

Important distinction: Independent FAT & SAT witnessing is a technical survey and reporting activity. It does not transfer responsibility for test execution, equipment manufacture, installation, commissioning or contractual acceptance from the responsible project party to PAMS.

Marine & Offshore FAT & SAT Applications

Marine Equipment

FAT and SAT witnessing for marine machinery, equipment, systems and components intended for vessels, shipyards and marine operations.

Offshore Equipment

Independent witnessing for offshore equipment and systems used on platforms, FPSO units, terminals, offshore facilities and associated projects.

Machinery & Systems

Technical witnessing of machinery, electrical, control, automation, safety and other systems subject to agreed FAT and SAT requirements.

Installed / Integrated Systems

SAT activities involving installed equipment, system integration, interfaces, functional operation and site-specific testing following installation.

FAT & SAT Documentation & Technical Records

Technical & Project Documentation

Available specifications, approved drawings, datasheets, equipment documentation, certificates, project requirements, installation records and applicable FAT/SAT procedures may be reviewed as relevant to the agreed scope.

FAT & SAT Test Documentation

Applicable test protocols, check sheets, test records, measured results, functional test records and commissioning-related documentation may be reviewed or referenced where made available.

FAT & SAT Findings & Follow-Up

Deficiencies, deviations, incomplete activities, test limitations or other technical observations identified during FAT or SAT may be recorded in the independent survey report.

Where requested and within the agreed scope, PAMS may attend subsequent re-testing, repeat FAT/SAT activities or verification of corrective actions.

Responsibility for correction: Resolution of deficiencies and completion of corrective actions remain with the manufacturer, supplier, contractor, commissioning organization or other responsible project party. PAMS independently records and reports the status observed during attendance.

FAT & SAT Survey Project Methodology

Scope Confirmation

Confirm the equipment, systems, test activities, location, applicable documentation and agreed FAT/SAT witnessing scope with the client.

Documentation Review

Review available technical and project documentation relevant to the agreed testing and verification activities.

FAT Attendance

Attend and independently witness agreed factory testing, recording applicable activities, observations and available test results.

SAT Attendance

Attend and independently witness agreed site testing following installation, including applicable functional and integration activities.

Technical Reporting

Prepare an independent report identifying witnessed activities, available results, technical observations, deficiencies and deviations within the agreed scope.

Follow-Up

Where requested, attend re-testing or follow-up verification after corrective actions and document the status observed during subsequent attendance.

Technical Value of Independent FAT & SAT Survey

  • Independent attendance during agreed FAT and/or SAT activities.
  • Objective recording of witnessed factory and site testing and available results.
  • Identification and documentation of deficiencies, deviations and incomplete installation or testing activities.
  • Reference to applicable technical, project and testing documentation made available for the survey.
  • Independent FAT & SAT survey reporting for project records and technical follow-up.
  • Potential follow-up witnessing of re-testing, corrective actions or re-verification activities.

Independent Technical Role

PAMS provides independent marine technical consultancy and surveying services. The precise FAT and/or SAT witnessing role is established by the client and project requirements before attendance.

The PAMS surveyor observes, verifies against the agreed scope where applicable, records and reports. PAMS does not assume responsibility for manufacturer testing, supplier testing, installation, commissioning or contractual acceptance unless a specific written authorization expressly defines an additional responsibility.

FAT & SAT Survey Resources

FAT & SAT Survey Main Service

Overview of PAMS independent FAT & SAT Survey services covering Factory and Site Acceptance Test witnessing, technical observation and reporting.

View FAT & SAT Survey Services →

FAT & SAT Survey Case Study

Review a project example demonstrating independent FAT and technical witnessing activities, observations and reporting.

View FAT & SAT Survey Case Study →

FAT & SAT Survey & Factory & Site Acceptance Testing

Technical reference article covering FAT and Site Acceptance Testing, independent witnessing and acceptance testing considerations.

Read FAT & SAT Survey Article →

FAT & SAT Survey Project FAQ

What is a FAT Survey?

A FAT Survey is an independent technical witnessing and reporting activity conducted during agreed Factory Acceptance Testing, normally before equipment is delivered or installed.

What is a SAT Survey?

A SAT Survey is an independent technical witnessing and reporting activity conducted during agreed Site Acceptance Testing, normally after equipment or systems have been installed at the designated vessel, site, offshore facility, terminal or project location.

What is the difference between FAT and SAT?

FAT is generally performed before delivery at the manufacturer or designated test facility, while SAT is generally performed after installation at the intended site or operational location. FAT focuses on equipment verification before delivery, while SAT can include installed functionality, interfaces, integration and site-specific verification.

Who performs the FAT and SAT?

The manufacturer, supplier, contractor, commissioning team or designated testing organization normally performs the FAT or SAT. PAMS may attend independently as a technical surveyor and witness agreed activities.

Does PAMS accept the equipment?

No. PAMS provides independent technical witnessing, observation and reporting. Contractual acceptance, release, commissioning authorization and final project approval remain with the responsible client, owner, purchaser or designated authority unless expressly assigned otherwise in writing.

What documentation is reviewed?

Depending on the agreed scope, documentation may include specifications, drawings, datasheets, certificates, approved FAT/SAT procedures, test protocols, equipment manuals, installation records, commissioning documentation and applicable project requirements.

Can PAMS document FAT and SAT deficiencies?

Yes. Observed deficiencies, deviations, incomplete activities, test limitations and other relevant technical observations may be recorded in the independent survey report.

Can PAMS witness FAT or SAT re-testing?

Yes, where requested and included within the agreed scope, PAMS may independently attend repeat testing, re-testing or corrective-action verification and report the status observed during the follow-up attendance.

Where can FAT and SAT Surveys be performed?

FAT witnessing may be performed at manufacturers, suppliers or designated testing facilities. SAT witnessing may be performed aboard vessels, at shipyards, offshore facilities, terminals, industrial sites or other designated project locations.

What is included in the FAT & SAT Survey report?

The report may identify the equipment or system, location and date of attendance, applicable scope, witnessed activities, available test results, technical observations, deficiencies, deviations and follow-up matters within the agreed survey scope.

Technical Reference Framework

FAT and SAT activities are performed against the applicable equipment and project requirements established for the specific assignment. Depending on the scope, these may include approved technical specifications, drawings, manufacturer documentation, FAT/SAT procedures, test protocols, contractual requirements, class and flag requirements, statutory requirements and applicable marine or offshore industry standards.

The exact reference framework depends on the equipment, vessel, facility, project and client requirements. PAMS records the relevant references made available and applicable to the agreed independent witnessing scope.

FAT & SAT Survey Project Reference Notice

Any FAT & SAT survey report, observation or finding relates specifically to the equipment, system, project, testing activity and scope attended. It should not be interpreted as general equipment certification, statutory approval, class approval or unrestricted contractual acceptance.

PAMS provides independent marine technical consultancy and surveying. Certification, statutory approval, class approval, commissioning authorization and contractual acceptance remain subject to the responsible authorities, project parties and applicable project arrangements.

Independent FAT & SAT Survey & Technical Witnessing

PAMS provides independent Factory Acceptance Test (FAT) and Site Acceptance Test (SAT) witnessing, technical observation and reporting for marine, offshore and industrial equipment and systems, supporting objective project verification before delivery, after installation and during agreed testing or follow-up activities.

FAT & Contact Us FAT & View Survey Services